Exposed aggregate
The top skin is washed back to reveal the stone in the mix. Textured, grippy underfoot and it hides marks better than anything else we lay.
- Best for
- Driveways, pools
- Underfoot
- Grippy
- Hides marks
- Very well
Exposed aggregate, honed, stamped and coloured concrete for Adelaide homes. The driveway, the pool surrounds, the alfresco — laid by the same crew that pours the foundations underneath them.
Every photograph below is our own work on an Adelaide job, not a stock library. Click any of them to see it properly.
Attach your plans, or just snap the area on your phone — either works. Tell us roughly how big it is, choose a time for us to come out, and it lands with the person who does the quoting, not a general inbox.
Pool surrounds are the fussiest concrete on a block — falls have to run away from the water, the surface has to stay grippy wet, and every edge is looked at from a deck chair all summer. So that is how we pour them.
Same slab underneath, five very different results on top. This is the part most people want explained in plain English, so here it is.
The top skin is washed back to reveal the stone in the mix. Textured, grippy underfoot and it hides marks better than anything else we lay.
Ground back and polished to a smooth, low-sheen surface that shows the stone as a cut face rather than a rounded one. The dressy option.
Pressed while it is still green to take a pattern — stone, tile or timber plank. A lot of look for the money, and it suits older homes.
Oxide through the mix rather than painted on top, so the colour goes all the way down and does not wear off the high spots.
Broom finished and honest about it. Still the right answer for shed slabs, side paths and anywhere the budget is better spent elsewhere.
Keep scrolling and the blade washes each finish across the same slab — plain grey, exposed aggregate, honed, charcoal and stamped. It is the same concrete underneath every time. The finish is the decision.
Pattern pressed into the slab while it is still green. Joints cut where they belong rather than wherever they land. Edges that run straight past a fence line. None of it costs much more — it just has to be set out before the trucks arrive, not after.
Four stages, and every one of them is ours. You deal with the same people from the quote to the day we hand it back.
We come to the house, measure it up and talk through finishes and colours on the spot. You get a written price, not a range.
Old concrete out, ground dug to level, formwork set and steel laid. This is the stage that decides whether it cracks, so it is the stage we do not rush.
Our own crew and our own pumps, so a tight side access or a rear yard is a booking, not a problem. Poured, screeded and levelled to the falls.
Washed back, stamped, honed or floated depending on what you picked — then cut, cleaned and sealed. We tell you when you can walk it and drive it.
The wash-back, the cut joints, the clean-up and the seal all happen long after the trucks have gone home. This is the part you actually live on, so it is the part we stay for.
“Danny is a champion to deal with. The boys did an amazing job for our driveway perimeter pathways and around the pool. Answered the 100s of questions I had for him and continues to do so even after the job is done. Couldn't ask for much more and would highly recommend.”
“Danny and his team did an amazing job with our driveway and perimeter concreting of our new home. Adelaide Custom Concrete and Construction put in extra time and work to make sure we had the best quality concreting.”
“Amazing service. Quoted and booked the job on the Monday, job completed on the Wednesday — ahead of schedule! Really impressed and grateful.”
“Excellent workmanship. Courteous, well mannered, efficient, clean, honest people.”
“Professional, good quality, reasonable cost.”
“Professional, competitive pricing and high quality work!”
The decorative work is what most people find us for, but the bulk of what the crew pours is bigger than a driveway. Warehouses, industrial sheds, commercial floors and placement work for other builders all run out of the same yard.
Big floors, poured flat and finished to spec.
Your pour, your program, our crew on the tools.
The ground sorted before the concrete lands.
Four pumps of our own — two 36 metre booms, a 17 metre boom for tight set-ups and a 2024 Zoomlion 100R line pump — with our own licensed operators. That is why a tight side access, a rear yard or a first floor pour is a booking rather than a problem — on a house or on a shed.
The northern suburbs are our home ground, but we are all over the metro area and out into the regions. Regional jobs are fine, we just need a bit more notice.
It depends on the size, the access, how much prep there is and which stone you pick — so anyone who quotes you a per-metre rate down the phone is guessing. What we can tell you is that exposed aggregate sits above plain grey and below honed and polished, and that the prep underneath is usually the part that moves the price, not the finish on top. We quote free, on site, in writing.
Rough rule: stay off it for 24 to 48 hours, keep it clear of vehicles for a week, and go easy on it for the first month while it comes up to strength. We will give you the actual numbers for your job before we leave, because weather changes them — a cold wet week and a hot dry one are not the same pour.
All concrete moves. What stops movement turning into an ugly crack is the prep and the control joints — the ground compacted properly, the right steel in it, and cuts put in at the right spacing while it is still young. That is why we do not rush stage two, and why we cut joints rather than hoping.
Exposed aggregate and decorative finishes are worth sealing — it lifts the colour, keeps oil and leaf stains out of the surface and makes it easier to hose off. We seal before we hand the job back. After that, expect to re-seal every few years depending on how much sun and traffic it gets.
Yes. Demolition, removal and carting away is part of what we do, along with the digging and levelling underneath. You do not need a separate excavation mob — we bring our own bobcat, tipper and excavator.
No, and that is the advantage of us owning the pumps. A line pump will run the mix down a side path or through a gate, and the boom pump will send it over the roof if it has to. Plenty of back yards get concreted that way. Tell us about the access on the enquiry and we will work out which pump the job needs.
Usually pretty closely. Colour comes through the mix as an oxide rather than as a coating, and the stone you choose changes the look as much as the colour does. We bring samples to the quote so you are picking off a real piece of concrete in your own daylight, not off a screen.
Yes. We are a registered building practitioner and we carry public liability and workers compensation. If your council or builder needs paperwork before we start, just ask and we will send it through.